PRODUCT INSTRUCTIONS

 T-3 INSTRUCTIONS 

Prior to installation check parts list! 

 Standard T-3 Includes: 

 Cover, Terminal Board, (5) Binding Post sets, Locking Nut, Anti-Spin Gasket, Connection Chart label and instructions 

STEP 1:

Most connecting hardware comes installed. To add extra binding posts, the set screw side is designed to be on the side of the cutout in the terminal bottom. Install connecting hardware, binding post or other accessories into the holes in the T-3 test station terminal. 

STEP 2:

Install Tinker & Rasor’s exclusive “anti-spin” gasket. Remove protective paper from one side of gasket and place sticky side inside the terminal and press firmly. Remove the remaining protective paper cover from the gasket. 

STEP 3:

​​ Place large black nut over 3-1/2” OD test station riser. 

STEP 4:

 Thread the cables through bottom of the T-3 terminal. Cables may be inserted on the set screw side of the binding post, or on the “Nut” side of the terminal, per your preference. 

STEP 5:

 Position the T-3 terminal to the desired alignment over the riser and press down firmly. The “anti-spin” gasket will seal the terminal to the riser. Tighten terminal to riser pipe with the large black nut while holding the terminal. 

STEP 6:

 Attach cables as required. 

SHORTCUTS

BUSINESS HOURS

Monday through Friday 7:30am to 4:00pm 

2828 FM 758

New Braunfels, TX 78130

MAILING ADDRESS

2828 FM 758

New Braunfels, TX 78130

CONTACT

Phone: 833-332-1010

International:  +1.830.253.5621

Email: info@tinker-rasor.com

  • Facebook - White Circle
  • Twitter - White Circle
  • LinkedIn - White Circle

Trouble with links? Try a different browser.

Older versions of Internet Explorer are no longer supported.

© 2019 Tinker & Rasor. Website Design by SA Solutions. Proudly created with Wix.com